Excavator size is a trade-off between access, production and transport. Choose the smallest machine that can do the job productively—then check it fits.

Updated 2026-09-183 sections
Quick answer

Use a 1–2 t mini excavator for landscaping and narrow access (around 1 m wide), a 3–5 t machine for house footings, driveways and service trenches, an 8–14 t machine for larger residential and light civil work, a 20–25 t machine for civil trenching and loading trucks, and 30 t+ for mass excavation and rock.

Start with access

The narrowest point between the road and the dig sets the upper limit. Mini excavators with retractable tracks can pass through gaps of around 0.8–1 m; 5 t machines need roughly 1.6–2 m.

Then match the dig

Check maximum dig depth and reach against your deepest trench and furthest spoil point. Bigger machines dig faster and deeper but need more space and heavier transport.

Think about transport

Machines up to about 5 t can travel on a large tilt tray or trailer; 8–25 t machines need a float; 30 t+ may need permits and escorts.

Excavator classes compared
ClassApprox. widthTypical dig depthCommon jobs
1–2 t mini0.8 – 1.3 m1.8 – 2.4 mLandscaping, pools, narrow access
3–5 t1.5 – 2.0 m2.8 – 3.5 mFootings, driveways, service trenches
8–14 t2.2 – 2.5 m4.0 – 5.0 mLarger sites, detention tanks, subdivisions
20–25 t2.8 – 3.2 m6.0 – 6.7 mCivil trenching, bulk dig, truck loading
30 t +3.2 m +7 m +Mass excavation, quarry, rock breaking

Dimensions vary by make and configuration; confirm specifications with the supplier.

FAQ

Common questions

What size excavator for a pool?

A 3–5 t excavator is common for residential pools, or a 1.7–2.5 t mini where access is tight.

What size excavator for a house slab?

Most house-site cut and fill and footings suit a 5–8 t excavator, often with a skid steer.

Can a mini excavator dig footings?

Yes, a 1.7–2.5 t machine can dig standard strip and pad footings, though more slowly than a larger machine.

Turn the job into a clear hire brief.

Suppliers answer faster and quote more accurately when they get the outcome, access, ground and dates up front.