Stormwater trenching equipment
Connect excavation, shoring, lifting, dewatering, bedding and reinstatement in a constrained corridor.
Typical plant includes excavator 13–20 t, trench shields, pump, trench roller. Connect excavation, shoring, lifting, dewatering, bedding and reinstatement in a constrained corridor.
Stormwater trenching equipment: work sequence and plant requirements
Locate services
Pothole existing services and confirm pipe grades before digging.
Excavate and shore
Dig in short runs and install shields or shoring for trenches deeper than 1.5 m.
Lay pipe
Keep the trench dry with pumps, lay bedding and pipe, and check grades.
Backfill and reinstate
Backfill in layers, compact with a trench roller or rammer, then reinstate surfaces.
Compare hire equipment for this work
Check machine classes, selection criteria and listed suppliers before requesting a quote.
Earthmoving Equipment Hire
Excavators, loaders, dozers, skid steers, backhoes and graders for digging, loading, trimming and bulk earthworks.
Earthmoving hire guide →Site conditions
Earthmoving hire suppliers for this project
Prepare a plant hire quote brief
Suppliers answer faster and quote more accurately when they get the outcome, access, ground and dates up front.